U.S.PRO engaged in architectural and engineering design for retail since 2006. The full-time architect of the company is always maximally involved in the full cycle of work with the object, which distinguishes our projects from other business proposals. Prompt response to changes helps to participate in all stages and conduct author's control over the implementation of a design project, architectural or engineering project.

We are well acquainted with the requirements of more than a hundred shopping centers, including: "Mega", "Afimall", "Atrium", "Europolis", "Watercolor", "Rio", "Spring", "Continent", "AVIAPARK", "AURA", "MoreMall", "Okhotny Ryad", VEGAS and many others.

The EOM Project


The project of electric power supply of an object is a document according to which equipment is purchased and the installation of the power supply system of a building, structure, premises takes place. The EOM power supply project must be developed and issued in accordance with a huge number of requirements and technical standards, which are specified in GOST and regulatory legal acts. Further operation of the power supply system is directly related to the project. Safety of use, efficient, safe use of equipment and uninterrupted electricity – all these factors depend on the quality of project development and connection to the power grid.

The necessary initial data for the design of power supply systems


  • Technical specifications, layout of electrical installations, power supply, list of connected electrical equipment;

  • Location (connection feature) and architectural data of the object;

  • The customer's wishes, the list of installed equipment, the functional purpose of each room, other data.




We carry out more than 1300 projects a year

о нас




Our advantages

The company "Yu.S.PRO" performs any project documentation for calculating estimates, entering a tender or coordinating with engineering services at the desired facility. We work according to building codes and regulations, comply with SNIP, JV, GOST, STU of shopping centers.


  • Deadlines for the execution of project documentation from 7 working days.

  • We use a database of requirements for the release of project documentation from most developers.

  • We strictly comply with the regulatory framework for construction.

  • We take into account the nuances of local suppliers and contractors.

  • Always loyal and ready to make changes if necessary for the result.

Example of EOM project documentation

What does the power supply project include?


  • general data;

  • the one-line scheme of the SCHAO and VRSCH;

  • emergency electric lighting network plan;

  • electric lighting network plan;

  • plan of an additional potential equalization system;

  • specification of equipment and materials;

  • layout of electrical equipment.



The set of working projects can be supplemented with sections:

  • water supply and sewerage — VK,

  • communication networks — SS,

  • automatic fire alarm system — APS,

  • automatic fire extinguishing — APT,

  • warning and evacuation management systems — SOE.