Cost

Costs for designing of engineering sections from US Pro.

  FOR OBXECTS, EXCLUDING CATERING FOR CATERING OBJECTS
  Architecture concepts, rubles for m2 M&E, rubles for m2 HVAC, rubles for m2 Cost of shop project (3 sections) Architecture concepts, rubles for m2 M&E, rubles for m2 HVAC, rubles for m2 Water/
wastewater, rubles for m2

Cost of project (4 sections)

Minimum up to 65 m2 24200,00 16500,00 19800,00 60500,00 24200,00 22500,00 30500,00 20500,00 97700,00
From 66 to 150 m2 440,00 200,00 290,00 930,00 440,00 270,00 440,00 240,00 1 390,00
From 151 to 300 m2 385,00 175,00 240,00 800,00 385,00 240,00 370,00 200,00 1 195,00
From 301 to 500 m2 330,00 165,00 220,00 715,00 330,00 230,00 340,00 190,00 1 090,00
From 501 to 700 m2 285,00 130,00 175,00 590,00 285,00 180,00 270,00 125,00 860,00
Over 700 m2 265,00 120,00 155,00 540,00 265,00 170,00 240,00 100,00 775,00

Cost of measurements carrying out by electrical measurements laboratory

Number of automatic switches Cost in Moscow city  Cost in Moscow region
Up to 16 pcs. 8 000,00 9 000,00
From 17 to 24 pcs. 10 000,00 11 000,00
From 25 to 36 pcs. 13 000,00 14 000,00